S-OIL 2010년 TA for Replacement of R2R Mushroom
S-OIL 2010년 TA for Replacement of R2R Mushroom
Work Detail - New mushroom manufacture
- Replacement of Mushroom
- Hexa-Mesh 19mm, 25mm W/D
- Castable Ramming
Main Material - Plibrico, Mix 1574
Material Quantity - Castable : 10ton


S-OIL 2010년 TA for Replacement of R2R Mushroom

Ramming Completion


Ramming Completion


Ramming Completion


Ramming Completion

S-OIL 2010년 R2R T/A Work
S-OIL 2010년 R2R T/A Work
Work Detail - Cyclone, Out-Let Pipe 교체
- Micro Feed Injector 분리
- Hexa-Mesh Replacement
- 내부비계 설치 및 해체


Thermal Reactor 내화물 시공(2기) SK #FCC PJT
Thermal Reactor 내화물 시공(2기) SK #FCC PJT
Project : #2 FCC Project
Client : SK Energy/Hyanyang Industrial
Period :
Work :
1. Thermal Reactor Brick Lining(No.2)
2. Decomposition Furnace Brick Lining
3. Incinerator Package Castable Gunning
4. Air Heater Refractory Lining(No.2)
5. Main Material : ANH KX-99, High Dense Brick, Kast-O-Lite 26 Li G Plus
6. Material Q’ty ; Brick 65,000sh, Castable : 190ton, others
Thermal Reactor 내화물 시공(2기) SK #FCC PJT

Check Wall Install.


Check Wall


Burner Tile & Back-Up Castable Casting


Ceramic Ferrule Install & Brick Laying

SK H-H2001 Heater Radiant Tube Revamping Work
SK H-H2001 Heater Radiant Tube Revamping Work
Work Detail - Stack & Convection Module Re-Install
- Radiant Tube Replacement
(A335 P9 8” x6”)
- New Burner Installation
- Field 배관 Fit-Up & W/D


S-OIL H-16101 Heater Convection Tube & ITS Replacement Work
S-OIL H-16101 Heater Convection Tube & ITS Replacement Work
Work Detail - H-16101 HTR Convection Tube All Replacement Work
- 2.6” x S/40 x 22m , P9 120ea
- Field Fit-Up & W/D


SI PROJECT Equipment, Piping Fabrication & Installation Work
SI PROJECT Equipment, Piping Fabrication & Installation Work
Work Detail - Equipment Installation
- Piping Fabrication & Installation
- General Work (Cleaning & Scaffolding)


2020년 SK NEP TA Work
2020년 SK NEP TA Work
Work Detail - Radiant Tube Replacement
- Convection Tube Replacement
- Radiant Wall IF Brick Erection
- Radiant Sidewall C/F Module & Fire Brick Replacement


SK인천석유화학 2022년 열원공정회수 PH-2 기계 배관 철골 설치




SK인천석유화학 2022년 #3LER 기계 배관 철골 설치




GS KALTEX 기자재 제작 및 납품(Casing 제작+내화물 시공+열처리)




S-OIL Thermal Reactor 2기 Casing 및 내화물 교체(1200톤 Crane이용)